 The JPI FUEL TECH is a waste to energy project, a fuel to generate power, with home address @ Cablong, Pozorrubio, Pangasinan, owned, develops and produces the undersigned JAIME P. IMBAT. To begin with, we are still on our infamy stage.
               
It is an opportunity indeed to introduce a new system to generate power (electricity) which will cut electricity bill by as much as 75%.
                And on this, we are appealing with your support and guidance that this will come into reality.
                As energy is the bloodline of any industry and as our country is a net importer to energy, our country suffers most hampering  our economic growth throwing millions of Filipinos  on jobless, for mostly if not all our industries is now considered on a sunset or meltdown situation.
                Alarm on this, our government finds solution to look for a new renewable energy but seems halt, for it is not viable and sustainable. (ex. Of w/c _______)
                As a result of which the Visayas and Mindanao suffers and felt power crisis, complains arise for it affect now daily now daily lives, industries go into bankruptcy as results of brown-outs.
               
                The solution is of temporary using gen. set by crude oil which put electric bills into sky high, a burden heavily subsidize by our government.
                As the region still needs 5,000MW, a need to construct to construct five (5) Mega Structure Thermal Power Plants (like Sual/Pagbilao etc.) but sounds impossible due to site problem and time of construction, electrifying the region sounds impossible and could never be achieve ‘till 2050 (World Bank Estimate).
                And on this, we are now introducing the JPI FUEL TECH Mobile Type Mini Thermal Power Plants (0.2MW) as a way of solution. It is all powered by JPI FUEL TECH PRODUCT (Patent was been released Dec. 11, 2013). A decentralize in form, a power plant that can be put on a garage or on a 3X3 meter lot area. Said fuel is the option fuel to replace coal and can energize the all world industries run by coal with everlasting supply. Also said fuel (JPI) emits neutral CO2, the very essence of all the COP-UNTCCC (Coal emits 25 billion metric tons CO2 yearly the cause of climate change that now begins to ruin our planet earth source AWAKE).
                To solve the power crisis of the Visayas and Mindanao a need of 25,000 units of the Mini Thermal Power Plant @ 0.2MW as the solution and can be done in two year time. Constructing 5 additional Thermal Power Plant @ 1,200MW will cost $50 billion ($10 billion X 5 units) or ₱2.250 trillion as against ₱375 billion (25,000 X ₱15M/unit) w/ same capacity @ 5,000MW. Site, time of construction, COST, environmental impact, job generated, foreign savings and un-necessary charges post a great difference putting it the cheapest, safest, simplest, sustainable and affordable in the production of electricity or in short it will re-define the power sector.

*To show how electricity been produce let’s see…..and we call energy 101.

Power plant video…..
THE PROCESS -
CHEMICAL ENERGY -- THERMAL EGERGY – MECHANICAL ENERGY (STEAM TURBINE) – ELECTRICAL ENERGY (GENERATOR).
THE OPERATIONAL-
A -    Bituminous Coal is imported from Indonesia, Australia and China (no locally produce as claim).
B -     Store on coal stock yard.
C -      Pulverizing to Pulverizing Plant (powder) to ignite (in thousands of tons daily eg. Sual, 15,000 tons daily)
D -    Pulverize Coal to Firing Chamber until it reach 540°C.
E -      Heat exchange to boiler tubes.
F -      Steam Produce to Turn Steam Turbines.
G -     Turbines to turn generator.
H -     Generator to produce electricity.
I -        DC electricity to AC electricity (Transformer).
J -      AC electricity to high Tension Transmission Lines (Grid).
K-      Sent to sub-station for re-powering (Due To System losses).
L -       Travels to electric post (NEA).
M-   To distributors – Meralco, Luelco, etc.
N -     To end user.

*Definition of Terms Simple
      
  A -  Bituminous Coal – imported igniteous fuel from Indonesia, Australia, China, etc.
  B -  Coal Yard – Stock Yard for Coal.
  C -  Coal pulverization plant – Coal to be pulverized in powder form for efficient firing.
  D -  Power Thermal Plant – a process from chemical energy to Thermal energy to Mechanical energy to Electrical energy.
      Ash Dispose Pit – pulverize coal to be stock by landfills.
  E -  Clean Coal Tech (CCT) – a process wherein, in the operation pulverize lime be added to make Coal CO2 emitted is in white No black – (16,000 tons daily) or some time they call it gasification process.
  F - Desalination Plant – process to remove salt from sea water to serve as feed H2O to the Thermal Plant. Key element on operation.
  G -  Condensing River – Man made river to condense SATURATED STEAM back to liquid form back to boiler tubes.

SHOW SYSTEM VIDEO------------*********-_________


THE JPI FUEL TECH MOBILE TYPE MINI THERMAL POWER PLANT
1  *     PROCESS and OPERATION-
2  *     THE JPI PLANT-
3  *     OPERATIONAL COST_JPI-

LABOR COST:
PERSONNEL
CATEGORY
RATE/DAY
RATE/MONTH
1
Plant Supervisor
P2,000
P60,000
3
Lead Men
P1,500
P135,000
12
Skilled Operator
P1,000
P360,000

Office Charges

P100,000


TOTAL COST
P655,000


*FUEL CONSUMPTION
= 5 tons JPI Fuel daily X P20/ton X 30 days
= P3,000,000.00 / Month
*PRODUCTION COST/MONTH.
= LABOR COST + FUEL COST
= P655,000.00 + P3,000,000.00
= P3,655,000.00
*PRODUCTION OUTPUT 0.2MW/MONTH
= 200KWH(0.2MW) X 24 hrs/day X 30 days
= Rule of Thumb = 144,000KWH
*PRODUCTION COST/KWH
= PRODUCTION COST ÷ PRODUCTION OUTPUT
= P3,655,000 ÷ 144,000KWH
= P2.5/KWH
*GIVEN PRODUCTION COST/KWH by other production
A - Coal fired – P28.50/kwh
B - Natural Gas – 62.00/kwh
C - Crude Oil – 58.00/kwh
D - Wind Energy – P50,000/kwh and not sustainable
E - Solar Energy- P30,000/kwh and not sustainabl
F - Biomass – P20,000/kwh and not sustainable
G - Methane Gas Power Plant - ??? – impossible 
H - Bio fuel feed Power Plant - ??? – impossible
      I -   Ethanol Fired Power Plant – A sky high and affect food and feed stock security


Comparative Study on using the JPI Fuel Mobile Type Mini Thermal Power Plant
1. Eliminate problem on pollution, JPI Fuel emits neutral  CO2 (Climate Change)
  2.   Eliminate Site problem – to construct power plants with 1,200MW capacity a need of 3,000 hectares as compared to 6 hectares (0.2MW X 1,200MW(6,000)X 10 sqm/plan) ready and available for it can be put in garage
  3.  Eliminate ash disposal pit in thousands of hectares
  4.  Eliminate coal pulverizing plant
  5.  Eliminate desalination plant
  6.  Eliminate the usage of GRID
  7.  Eliminate sub re-powering station
  8.  Eliminate unnecessary changes – eg. Environmental
  9.  Eliminate fuel adjustment charger
  10.  Job generation in million
  11.   Foreign Saving
  12.   Foreign earnings
  13.   No more carbon charge (CO2) 
  14.  In-come from pollution from COP-UNFCCC (Carbon incentive) @ Eu 52/tons CO2) our country’s wealth

-          TO MEET DEMAND –

·         All Parts to be Contracted to different Companies
·         Assembly line System @ one (1) Mini Thermal Power Plants / Assembly line
(To electrify the Visayas & Mindanao a need  of 25,000 units Mini Thermal Power Plants)

USING STEPS
1-      INSTALL FRAMES (SKELETAL)
2-      INSTALL STEAM BOILER (0.2MW)
3-      CONNECT STEAM PIPES TO TURBINE (Model 80.250 OND TYPE)
4-      INSTALL TURBINE & ACCESSORIES - 3,000 RPM
5-      INSTALL AND CONNECT GENERATOR (Senyo 0.2MW)
6-      INSTALL CONDENSER ASSEMBLY
7-      INSTALL WATER PUMPS 5PCS @ 0.5HP
8-      INSTALL PIPPING / ACCESSORIES / PRESSURE PUMPS
9-      INSTALL BURNING CHAMBER
10-   INSTALL SIDINGS AND DOORS
11-   FINISH PRODUCT YARD

THE FLOW CHART
1-10 STOCK YARD

*NOTES:
A- Our country still needs 15,000MW or 75,000 units of Mini Thermal Power Plants doable in three year time
B- The World needs 600 million units (JPI Mini Plant)  toward industrialization – Huge Delapelate Thermal Power Plants schedule to be de-commissions due to CO2 pollution and total shut down on all Nuclear Power Plants
-All Achievable, doable in 5 year time – Franchising

·         Selling Price per unit of Mini Thermal Power Plant  - P15 Million
·         ROI – One month

=THE JPI FUEL=
·         Our country needs 80 million metric tons of the Fuel yearly
·         The country’s WASTE is 260 million tons yearly that stay rotten or been burn
·         180 tons exportable to nearby APAC

THE JPI FUEL TECH PROCESS
A)     Collect waste raw materials (All over the country side)
B)      To JPI processing plant – up to 600 processing plant around the country
C)      World Industry Demand is 400 billion metric tons yearly World Waste is 650 billion metric tons scattered to any corner of the world


THE JPI FUEL TECH

Old woman (cleaning) collect waste to processing plant


THE NEGATIVE IMPACT ON STATIONARY INDUSTRIES RUN BY COAL
-          CLIMATE CHANGE – Coal emits 25 billion metric tons CO2 yearly
-          UNPREVENTED SNOW – Oklahoma
-          SUPER TYPHOON – Tacloban
-          ROCK FROM THE SKY- Russian Incident

CONCLUSION:

VIDEOS
BIG POWER PLANT    VS    JPI’s MOBILE TYPE MINI PLANT